News

25.05.2021

Gazprom VNIIGAZ LLC carried out periodic tests of pipe products of BT SVAP LLC

A complex of periodic tests of the company's pipe products was successfully completed in the Production and Logistics Complex "SVAP-YUG'' in Astrakhan. The tests were intended to confirm their compliance with the current regulatory documents of PJSC Gazprom.

Based on the results of the complex of tests carried out by the commission of Gazprom VNIIGAZ LLC, the verification materials will be sent to the Permanent Commission of PJSC Gazprom for the acceptance of new types of pipe products for extension until 2026 of the technical conditions for protective and weighting coatings "ZUB" produced by BT SVAP LLC since 2014.


IMG_6750.jpg

IMG_4439.jpg

← All News