News

08.06.2021

The first 500 tons of large diameter piles for the construction of the Utrenny LNG Terminal

The batch consisted of sections of piles with a diameter of 2520 mm with a wall thickness of 28-30 mm, each weighing more than 40 tons and a length of about 24 meters, produced in the engineering and production complex "SVAP-Center'' in Orekhovo-Zuevo. Specialists of IPK "SVAP-Center" performed a set of production works for the manufacture of piles with their subsequent painting, assembly and shipment.

The first batch of piled products for Utrenny LNG will be delivered by specialized railway platforms on the required delivery basis to the port of Arkhangelsk.

These piles will be used at the construction site of the LNG and Stable Gas Condensate Terminal for the construction of a protective (ice protection) structure.

IMG_5113.png

← All News