News

08.09.2021

"Sever Bay" port

Within the framework of the “Construction of the oil terminal“ Port of the Bay Sever ” project on the Taimyr Peninsula BT SVAP LLC has developed design and working documentation for the manufacture of auxiliary technological equipment necessary for driving piles 1220mm, 1420mm and 2520mm in the amount of 5 units on the basis of the Customer's Terms of Reference JSC “United Power Engineering Corporation ".

Manufacturing and control assembly of the first 2 conductors 1200mm and 1420mm is planned for PLC "SVAP-YUG" in September 2021 with their subsequent delivery to Arkhangelsk.

5ee6ddf3-be2d-42f3-b337-7474b557d057.png


← All News