|
News | |
16.01.2015
Results of research conducted by BT SVAP specialists were published in the "Industrial safety" magazine.
14.01.2015
BT SVAP company manufactured steel pipes with protective concrete weight coating in metal galvanized jacket for “Neftegazstroy” LLC in 2014.
12.01.2015
The code «Engineering and construction of civil underground gas and water pipelines using the pipes with ballast coating in metal-polymeric jacket” developed by BP SVAP specialists received recognition by subject specialists.
08.12.2014
“Lukoil Nizhnevolzhskneft” company announced successful completion of works on first stage of pipeline systems installation at Filanovsky field in Russian sector of the Caspian sea in October, 2014. Over 350 thousand meters of pipes with protective weight concrete coating manufactured according to «ЗУБ» technology were used in the pipeline system.
02.12.2014
The Russian President says it is impossible to continue project implementation under present conditions. The same capacity gas pipeline will be constructed constructed instead of “South stream” towards Turkey over the Black sea.
News 311 - 315 of 328 First | Prev. | 61 62 63 64 65 | Next | Last |






